Unit 5:
Review of Project
Date: Friday 19th October
Location: Leith house orchards - Burnham Thorpe
The crew and I arrived at the campsite at 10am,
upon arrival we met the client and briefed her on the shooting schedule. Group
B arrived at the same time and we discussed what hours we would share the
actors and planned a suitable time for them to have breaks/lunch. After the
client had set up the bell-tent, Group B took the actors at 11:30 for 1 hour
during this time the crew set up the equipment, props, took a quick recce and
captured cutaways.
At 13:45 we began to film the actual footage,
during this time we were quick but made the best quality possible in the time
we had, by 17:30 we had filmed everything bar the last scene by the campfire.
This had to be filmed later to get the evening effect and a glow of warmth upon
the skin of the actors. Ali (the director) and Sam (the producer) stayed behind
and got a later lift home in order to film.
We did encounter a few minor step backs/problems
throughout the day, the step backs being that Group B ran over their allocated
time slots, therefore setting us back along with batteries dying, however the
other problems were very minor and we overcame them with no issues.
The things i would do differently is; having the
actors all day without sharing with another group, to use another location and
maybe get some other angles in a scene, however the shoot went really well for
the time we had allocated and the client was impressed with our work; therefore
it was a really good shoot/day.